Energy revolution – free energy

Today 28.10.2011 in Bologna something very special will happen that could potentially touch the lives of everyone on the planet.

Andre Rossi’s 1MW eCat Plant will begin operation in a series of tests designed to prove the technology to the US based customer – and more importantly to the waiting world. A successful test of the 1MW Energy Catalyzer should be enough to take us into a new era of cheap, clean energy generation, possibly triggering a positive economic tide to lift all ships.

More details freeenergytruth

updated from e-catworld.com: “Q&A just finished; reading of results; 470 kW maintained continuously during self-sustain; customer satisfied; sale made; more later.”

Leave a Reply